EE394J_2, Power System Engineering II, Spring 2009
Course description
EE394J_2_Spring09_Course_Desc.pdf
---------------------------
Lectures and supporting materials
Electric_Power_Fundamentals_Spring09.ppt
Voltage_Current_Power_Illustrator_Spring09.xls
Per_Unit_Spring09.pdf
Notes_on_Symmetrical_Components.pdf
Program ABC012.exe
Notes_on_Transmission_Lines.pdf
Hand_Notes_on_C_and_L.pdf
Notes_on_Transmission_Line_Constants_PosNegZero.pdf
Notes_on_Thevenin_Equivalents.pdf
Notes_on_Nodal_Analysis.pdf
Notes_on_System_Matrices.pdf
Notes_on_Generator_Short_Circuit_Modeling.pdf
Notes_on_Short_Circuits.pdf
Notes_on_Voltage_Sag_Propagation_Along_Feeders.pdf
Notes_on_Loadflow.pdf
Notes_on_Transformers.pdf
Notes_on_Programming_Considerations.pdf
---------------------------
Homework
HW1, Probs. 1.6, 1.13, 1.16, 1.17, 1.19. For Friday, Jan. 30.
HW2, Probs. 6.15 and 6.16, modified as shown on
Grainger_Stevenson_PU and Short_Circuit_Problems_Spring09.pdf.
For Friday, Feb. 6.
HW3, Probs. 11.11 and 11.12 on the HW2 document. For Friday, Feb. 13.
HW4, Pos/Neg/Zero sequence lines constants for one side of a 345kV transmission line (ignoring ground wires).
EE394J_Spring09_HW4_345kV_Transmission_Line.pdf. For Friday, Feb. 20.
HW5,
Ymatrix_Problem_1.pdf,
For Wed, Mar. 4.
HW6,
Zmatrix_Problem_1.pdf,
For Fri, Mar. 6.
HW7,
Work SC Problem 1 in the document from HW2,
For Mon, Mar. 9.
HW8,
Work SC Problem 2 in the document from HW2,
For Wed, Mar. 11.
HW9,
Work out equations for line-to-line-to-ground fault, having zero fault impedance,
For Mon, Mar. 23.
Homework Solutions
EE394J_Spring09_HW1_through_HW4_Solutions.pdf
---------------------------
Tests and Final Exam
---------------------------
Projects
EE394J_Spring09_Design_Project_Network.zip